North Union Township and their representatives are not responsible for bids mailed but not received. North Union Township reserves the right to reject any or all Bids or portions thereof, and to accept any Bid, or portion of Bid, and the right to waive any immaterial defects in the bidding process, which in its judgment is in the best interest of the Township. Liquid Fuels funds will be utilized for funding a portion of this project and all materials and work must conform to the most recent edition of PennDOT Publication 408 in place at the time of bid submission unless otherwise specified. The project documents contain provisions regarding the applicability of PA Prevailing Wages. The successful Bidder will be required to furnish and pay for a satisfactory Performance Bond, and a Labor and Material Payment Bond, each in the amount of 100% of the Contract Price with a corporate surety approved by the Owner. The work location is more specifically identified in the project manual/bid documents. The Work generally consists of furnishing all equipment, labor and materials for, but not necessarily limited to, the following: bituminous leveling and overlay courses, incidental milling and sealing. The Work must be completed prior to August 31, 2023. All Bids shall be effective for sixty (60) calendar days. SR 1001 over Tributary to Susquehanna RiverĢ023 Multi-Municipal Bituminous Seal Coatīids for this Contract shall be accompanied by a Bid Security in the amount of ten percent (10%) of the Bid. New Construction, Infrastructure - 45,000 SF Street/Road Resurfacing/Paving Wearing CourseĬold in Place Asphalt Recycling 2022 CIP Wild CherryĮMD Electronics Tungsten Hexafluoride Gas Manufacturing Plant Expansion RFP D/B - USCG National Multiple Award Construction Contract (NMACC III) Demolition, New Construction, Infrastructure
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |